-
-
Products & Solution
-
-

CASE
CASE
The project is Zhangzhou City, with a construction area of about 150 square meters. Including precision air conditioning room, high precision air conditioning room.
New plant water system and cold storage UPS transformation project
The purified water circulation system and the injection water circulation system are respectively distributed through the circulation pump, and the system is required to maintain continuous operation for 24 hours. During the operation of the system, the power supply may be interrupted due to sudden power failure, thus affecting the supply of purified water and water for injection. So far, it is necessary to realize seamless switching by installing UPS power supply to avoid the above problems.
Fuzhou Tuofu Plaza 1-3# building ventilation and air conditioning project
Project content: air system, water system and building automation system (BA system) engineering of ventilation and air conditioning engineering
Royo Hotel Ballroom Ventilation and Air Conditioning Project
Royo Hotel Ballroom Ventilation and Air Conditioning Project
Xiamen SM Commercial City (Phase III) HVAC Project
Contract amount: 45.7 million yuan Venue: Intersection of Jiahe Road and Xianyue Road, Huli District, Xiamen City
Sanbao Plaza office building and commercial project air conditioning project
Sanbao Plaza office building and commercial project air conditioning project
Social Media

Official WeChat
Contact Information
Address: 901, Building 02, Area F, Phase III Software Park, jimei district City, Xiamen City
Telephone:0592-5804883
Fax:0592-5803779
E-mail:yangdaac@163.com
All Rights Reserved © 2024 Xiamen Xinyanda Environmental Technology Co., Ltd