CASE
CASE

CASE

Constant Temperature and Humidity Air Conditioning (Dry Laboratory) for Energy Materials Building, Xiang'an Campus, Xiamen University

Constant Temperature and Humidity Air Conditioning (Dry Laboratory) of Energy Materials Building in Xiangan Campus

Fujian Longxi Bearing (Group) Co., Ltd. Special Products New Constant Temperature and Humidity Laboratory Project

The project is Zhangzhou City, with a construction area of about 150 square meters. Including precision air conditioning room, high precision air conditioning room.

Constant temperature and humidity air conditioning (dry laboratory) equipment procurement and installation

This project is a constant temperature and humidity air conditioner for the energy materials building of xiamen university xiang'an campus (the dry laboratory covers an area of about 77 square meters. It is located on the fourth floor of 5# building. It includes decoration works, HVAC, exhaust, weak current, fire fighting and other works.)

New plant water system and cold storage UPS transformation project

The purified water circulation system and the injection water circulation system are respectively distributed through the circulation pump, and the system is required to maintain continuous operation for 24 hours. During the operation of the system, the power supply may be interrupted due to sudden power failure, thus affecting the supply of purified water and water for injection. So far, it is necessary to realize seamless switching by installing UPS power supply to avoid the above problems.